Thyssenkrupp Levant Stair Lift Installation Manual Full [updated] (2024)
Ensure the transformer is plugged in and the rail charging strips are clean. To help me tailor this documentation, please let me know:
Verify that the continuous copper charging strips inside the rail channel are clean and unbroken across the joints. thyssenkrupp levant stair lift installation manual full
Ensure a dedicated GPO (General Purpose Outlet) is within reach of the transformer cable. 2. Rail Assembly & Mounting Ensure the transformer is plugged in and the
if you already have a physical or digital manual and need clarification on a specific step (e.g., rail cutting, charge point wiring, floor-to-rail clearance). Do not over-grease
Inspect the rail gear rack and lightly lubricate it with a thin layer of silicone spray or white lithium grease if dry. Do not over-grease.
Connect the low-voltage output cable from the transformer to the terminal block located at either the top or bottom end of the rail.